EPC Delivery of a 38.5 MWp Utility-Scale PV Power Plant
Adrem is delivering the engineering, construction, installation, and commissioning of a utility-scale photovoltaic power plant located in Țintești, Buzău County, Romania. The project is developed across a site of approximately 392,000 sqm and includes both the energy generation facilities and the full grid connection infrastructure required for integration into the National Energy System.
The scope of works covers the full EPC delivery of the PV power plant, including both inside the fence and grid connection (all civil works, electrical and electromechanical installations, internal medium-voltage networks, protection systems, grounding, monitoring, and control solutions.).
A key component of the project is the high-voltage grid connection, consisting of the construction of a new 20/110 kV internal substation and the installation of a 110 kV underground transmission line of approximately 4.7 km, connecting the plant to the 110/20 kV Maxenu substation. These works ensure secure power evacuation and full compliance with national grid code and transmission system operator requirements.